What types of construction organization are in demand in Russia

Construction organization: what is it, what methods exist

The organization of construction is a harmonious system, which is a relationship between the contractor and the construction customer.

It can be noted that the organization of construction consists of a set of measures by the Contractor, in order to obtain an order. Take 3 methods of construction organization:

The first method is traditional.

Second – contextual control.

The third method is construction and design.

The most common method of organizing construction is the traditional. It includes several stages. This first is the preparation of a design agreement. The signing document includes construction drawings and specifications, determination of the volume of work and the preparation of documentation. In the second stage, a tender of a closed or open nature is produced. With the winner of the tender, the organizer of the construction concludes an agreement. This order executor will be called the General Contractor.